Highway 50 and Mayfield Road, Mult-Modal Carpool Facility

Highway 50 and Mayfield Road, Mult-Modal Carpool Facility

Client: Region of Peel and GO Transit / Metrolinx Services: Class Environmental Assessment Site Planning Stormwater Management Study Detailed Design Contract Administration Resident Site Inspection Post-Construction  Key Features: Over 200 paved parking spaces GO bus service Dedicated transit access and lanes Heated enclosed transit shelter LED overhead lighting on timers Infiltration basins for g ...[Read More]

Concession 3 Bridge Rehabilitation

Concession 3 Bridge Rehabilitation

Client: Township of Uxbridge Services: Detailed Design, Site Inspection and Construction Administration Key Features: Design of a new timber-concrete composite deck Partial replacement of one abutment pile due to rot The Township of Uxbridge retained Chisholm, Fleming and Associates (CFA) to complete a timber investigation on the Concession Road 3 Bridge. The timber investigation included testing ...[Read More]

Helen Avenue Urbanization from Kennedy Road to Greenberg Gate

Helen Avenue Urbanization from Kennedy Road to Greenberg Gate

Client: City of Markham Services: Preliminary Design, Detailed Design, Contract Administration, Site Inspection Key Features: 210 m of existing 2 lane rural road c/w roadside ditches reconstructed to a 2 lane urban cross-section complete with 450 mm diameter storm sewers The purpose of this project was to reconstruct a short section of Hele Avenue and to urbanize it complete with a sidewalk on one ...[Read More]

Roncesvalles Avenue Road Reconstruction and TTC Track Reconstruction

Roncesvalles Avenue Road Reconstruction and TTC Track Reconstruction

Client: City of Toronto Services: Detailed Design, Contract Administration and Resident Site Inspection, Community Liaison, Post-Construction Services Key Features: 7 km long road, TTC track reconstruction and streetscaping on Roncesvalles Avenue including new sewer and watermains, replacement of streetcar tracks, new sidewalks, removal of two lanes, integrated streetcar platforms, pavement recons ...[Read More]

Consumers Drive Widening

Consumers Drive Widening

Client: Region of Durham Services: Class Environmental Assessment Design Key Features:   Reconstruction and widening of Consumers Drive in Whitby from Hopkins Street to Thickson Road (0.7 km) Extension of twin 2400 mm diameter CSP culverts on West Corbett Creek 150 m of lightweight road construction through the Corbett Creek Lightweight road constructed following a preloading period of one year. P ...[Read More]

Bolton Heights Drive Urbanization Kingsview Drive to Regional Road 50

Bolton Heights Drive Urbanization Kingsview Drive to Regional Road 50

Client: Town of Caledon Services: Preliminary Design, Detailed Design, Contract Administration, Site Inspection Key Features: Fast-tracked design and construction 380 m of existing 2 lane rural road c/w roadside ditches widened to a 2 lane urban cross-section complete with parking areas, storm sewers ranging in size from 300 mm diameter to 450 mm The purpose of this project was to reconstruct Bolt ...[Read More]

Altona Road Reconstruction and Widening

Altona Road Reconstruction and Widening

Client: Region of Durham Services: Class Environmental Assessment, Detailed Design Key Features: 2.0 kilometres of arterial road reconstruction and widening to 4 lanes between Kingston Road and Strouds Lane Bridge replacement over CN Rail Bridge designed as “thin profile” in order to meet geometric constraints at adjacent intersection with Sheppard Avenue Off-road asphalt multi-use pathway designe ...[Read More]